Indian glassware manufacturer Borosil has installed an all-electric 42 tonnes/day opal glass furnace supplied by JSJ Jodeit.
The furnace will be used to produce tableware glass at Borosil's Jaipur, Rajasthan, India facility. The furnace is identical in construction to an existing one.
Compared to the first furnace, the second furnace was brought up to the latest technical standards in all safety-relevant aspects and technically adapted accordingly using modern engineering solutions.
Read more from Furnaces International
Date posted 30/03/2023
JOIN OUR MAILING LIST
Be the first to hear about exhibitors, speakers and what's on at our upcoming events.