Verallia will construct two additional furnaces by 2025 and 2026 to increase its capacity production and respond to the market’s needs. The two furnaces will be located in Spain and Italy, by 2025 and 2026.
Two other construct furnaces, which are already under construction will be fully operational during 2024. These will be located in Campo Bom (Brazil) and Pescia (Italy).
They will both be powered by oxy-combustion, reducing CO2 emissions by 18% compared to traditional technology.
Read more from Glass International
Date posted 17/01/23
JOIN OUR MAILING LIST
Be the first to hear about exhibitors, speakers and what's on at our upcoming events.